epscm.gms : eps-Constraint Method for Multiobjective Optimization


The eps-Constraint Method

This is a GAMS implementation of the augmented eps-constraint method
for generating the efficient (Pareto optimal, nondominated) solutions
in multiobjective problems. The eps-constraint method optimizes one of
the objective functions using the remaining objective functions as
constraints, varying their right hand side.

The generated optimal solutions proved to be efficient solutions of
the multiobjective problem under certain conditions.

The eps-constraint method consists of two phases:
1. Creation of the payoff table
2. Use the ranges from the payoff table in order to apply the method

The augmented eps-constraint uses lexicographic optimization in the
construction of the payoff table (in order to secure the Pareto
optimality of the individual optima) and a slightly modified objective
function in order to ensure the production of Pareto optimal (and not
weakly Pareto optimal) solutions. In addition, it performs early exit
from infeasible loops improving the performance of the algorithm in
multi-objective problems with several objective functions.

The algorithm can work also with MIP models. Actually the advantages
of the eps-constraint method over the weighting method are more
apparent for MIP problems where the non supported Pareto optimal
solutions can be produced.

A simplified power generation problem is used to illustrate the
method:

Four types of power generation units are considered in a region,
namely, lignite fired, oil fired, natural gas fired and units
exploiting renewable energy sources (RES) which are mostly small hydro
and wind.  The power generation characteristics of these units are
shown in table pdata.

The yearly demand is 64000 GWh and is characterized by a load duration
curve which can be divided into three type of loads: base load (60%),
medium load (30%) and peak load (10%). The lignite fired units can be
used only for base and middle load, the oil fired units for middle and
peak load, the RES units for base and peak load and the natural gas
fired units for all type of loads. The endogenous sources are lignite
and RES.

We consider three objective functions: the minimization of production
cost, the minimization of CO2 emissions and the minimization of
external dependence (i.e. oil and natural gas) by maximizing the
endogenous energy sources.  The task is to generate the payoff table
and the Pareto optimal (efficient, non-dominated) solutions of the
problem.

Additional information can be found at:

http://www.gams.com/modlib/adddocs/epscm.pdf

Reference:
Small Model of Type: LP
$TITLE eps-Constraint Method for Multiobjective Optimization (EPSCM,SEQ=319) $ontext The eps-Constraint Method This is a GAMS implementation of the augmented eps-constraint method for generating the efficient (Pareto optimal, nondominated) solutions in multiobjective problems. The eps-constraint method optimizes one of the objective functions using the remaining objective functions as constraints, varying their right hand side. The generated optimal solutions proved to be efficient solutions of the multiobjective problem under certain conditions. The eps-constraint method consists of two phases: 1. Creation of the payoff table 2. Use the ranges from the payoff table in order to apply the method The augmented eps-constraint uses lexicographic optimization in the construction of the payoff table (in order to secure the Pareto optimality of the individual optima) and a slightly modified objective function in order to ensure the production of Pareto optimal (and not weakly Pareto optimal) solutions. In addition, it performs early exit from infeasible loops improving the performance of the algorithm in multi-objective problems with several objective functions. The algorithm can work also with MIP models. Actually the advantages of the eps-constraint method over the weighting method are more apparent for MIP problems where the non supported Pareto optimal solutions can be produced. A simplified power generation problem is used to illustrate the method: Four types of power generation units are considered in a region, namely, lignite fired, oil fired, natural gas fired and units exploiting renewable energy sources (RES) which are mostly small hydro and wind. The power generation characteristics of these units are shown in table pdata. The yearly demand is 64000 GWh and is characterized by a load duration curve which can be divided into three type of loads: base load (60%), medium load (30%) and peak load (10%). The lignite fired units can be used only for base and middle load, the oil fired units for middle and peak load, the RES units for base and peak load and the natural gas fired units for all type of loads. The endogenous sources are lignite and RES. We consider three objective functions: the minimization of production cost, the minimization of CO2 emissions and the minimization of external dependence (i.e. oil and natural gas) by maximizing the endogenous energy sources. The task is to generate the payoff table and the Pareto optimal (efficient, non-dominated) solutions of the problem. Additional information can be found at: http://www.gams.com/modlib/adddocs/epscm.pdf Mavrotas, G, Generation of efficient solutions in Multiobjective Mathematical Programming problems using GAMS. Tech. rep., School of Chemical Engineering, National Technical University of Athens, 2006. $offtext $inlinecom [ ] $eolcom // $STitle Example model definitions Sets p power generation units / Lignite, Oil, Gas, RES / i load areas / base, middle, peak / pi(p,i) availability of unit for load types / Lignite.(base,middle), Oil.(middle,peak), Gas.set.i, RES.(base, peak) / es(p) endogenous sources / Lignite, RES / k objective functions / cost, CO2emission, endogenous / $set min -1 $set max +1 Parameter dir(k) direction of the objective functions / cost %min%, CO2emission %min%, endogenous %max% /; Set pheader / capacity, cost, CO2emission /; Table pdata(pheader,p) Lignite Oil Gas RES capacity [GWh] 31000 15000 22000 10000 cost [$/MWh] 30 75 60 90 CO2emission [t/MWh] 1.44 0.72 0.45 0; Parameter ad annual demand in GWh / 64000 / df(i) demand fraction for load type / base 0.6, middle 0.3, peak 0.1 / demand(i) demand for load type in GWh; demand(i) = ad*df(i); Variables z(k) objective function variables Positive Variables x(p,i) production level of unit in load area in GWh Equations objcost objective for minimizing cost in K$ objco2 objective for minimizing CO2 emissions in Kt objes objective for maximizing endogenous sources in GWh defcap(p) capacity constraint defdem(i) demand satisfaction ; * Objective functions objcost.. sum(pi(p,i), pdata('cost',p)*x(pi)) =e= z('cost'); objco2.. sum(pi(p,i), pdata('CO2emission',p)*x(pi)) =e= z('CO2emission'); objes.. sum(pi(es,i), x(pi)) =e= z('endogenous'); defcap(p).. sum(pi(p,i), x(pi)) =l= pdata('capacity',p); defdem(i).. sum(pi(p,i), x(pi)) =g= demand(i); Model example / all /; $STitle eps-constraint method Set k1(k) the first element of k, km1(k) all but the first elements of k; k1(k)$(ord(k)=1) = yes; km1(k)=yes; km1(k1) = no; Set kk(k) active objective function in constraint allobj Parameter rhs(k) right hand side of the constrained obj functions in eps-constraint maxobj(k) maximum value from the payoff table minobj(k) minimum value from the payoff table Variables a_objval auxiliary variable for the objective function obj auxiliary variable during the construction of the payoff table Positive Variables sl(k) slack or surplus variables for the eps-constraints Equations con_obj(k) constrained objective functions augm_obj augmented objective function to avoid weakly efficient solutions allobj all the objective functions in one expression; con_obj(km1).. z(km1) - dir(km1)*sl(km1) =e= rhs(km1); * We optimize the first objective function and put the others as constraints * the second term is for avoiding weakly efficient points augm_obj.. sum(k1,dir(k1)*z(k1))+1e-3*sum(km1,sl(km1)/(maxobj(km1)-minobj(km1))) =e= a_objval; allobj.. sum(kk, dir(kk)*z(kk)) =e= obj; Model mod_payoff / example, allobj / ; Model mod_epsmethod / example, con_obj, augm_obj / ; option limrow=0, limcol=0, solprint=off, solvelink=2; Parameter payoff(k,k) payoff tables entries; Alias(k,kp); * Generate payoff table applying lexicographic optimization loop(kp, kk(kp)=yes; repeat solve mod_payoff using lp maximizing obj; payoff(kp,kk) = z.l(kk); z.fx(kk) = z.l(kk); // freeze the value of the last objective optimized kk(k++1) = kk(k); // cycle through the objective functions until kk(kp); kk(kp) = no; * release the fixed values of the objective functions for the new iteration z.up(k) = inf; z.lo(k) =-inf; ); if (mod_payoff.modelstat<>1, abort 'no optimal solution for mod_payoff'); display payoff; minobj(k)=smin(kp,payoff(kp,k)); maxobj(k)=smax(kp,payoff(kp,k)); $set fname p.scr File fx solution points from eps-method / "%gams.scrdir%%fname%" /; $if not set gridpoints $set gridpoints 10 Set g grid points /g0*g%gridpoints%/ grid(k,g) grid Parameter gridrhs(k,g) rhs of eps-constraint at grid point maxg(k) maximum point in grid for objective posg(k) grid position of objective firstOffMax, lastZero some counters numk(k) ordinal value of k starting with 1 numg(g) ordinal value of g starting with 0; lastZero=1; loop(km1, numk(km1)=lastZero; lastZero=lastZero+1); numg(g) = ord(g)-1; grid(km1,g) = yes; // Here we could define different grid intervals for different objectives maxg(km1) = smax(grid(km1,g), numg(g)); gridrhs(grid(km1,g))$(%min%=dir(km1)) = maxobj(km1) - numg(g)/maxg(km1)*(maxobj(km1)- minobj(km1)); gridrhs(grid(km1,g))$(%max%=dir(km1)) = minobj(km1) + numg(g)/maxg(km1)*(maxobj(km1)- minobj(km1)); display gridrhs; * Walk the grid points and take shortcuts if the model becomes infeasible posg(km1) = 0; repeat rhs(km1) = sum(grid(km1,g)$(numg(g)=posg(km1)), gridrhs(km1,g)); solve mod_epsmethod maximizing a_objval using lp; if (mod_epsmethod.modelstat<>1, // not optimal is in this case infeasible lastZero = 0; loop(km1$(posg(km1)>0 and lastZero=0), lastZero=numk(km1)); posg(km1)$(numk(km1)<=lastZero) = maxg(km1); // skip all solves for more demanding values of rhs(km1) else loop(k, put fx z.l(k):12:2); put /); * Proceed forward in the grid firstOffMax = 0; loop(km1$(posg(km1)<maxg(km1) and firstOffMax=0), posg(km1)=posg(km1)+1; firstOffMax=numk(km1)); posg(km1)$(numk(km1)<firstOffMax) = 0; until sum(km1$(posg(km1)=maxg(km1)),1)=card(km1) and firstOffMax=0; putclose fx; // close the point file * Get unique solutions from the point file using some Posix Tools (awk, sort, uniq) that come with GAMS $set awkscript awk.scr file fa / "%gams.scrdir%%awkscript%" /; put fa 'BEGIN { printf("Table solutions(*,*)\n$ondelim\nsol'; loop(k, put ',' k.tl:0); putclose '\n"); }' / '{ print NR,$0 }' / 'END { print ";" }'; execute 'cd "%gams.scrdir%" && sort %fname% | uniq | awk -f %awkscript% > g.scr && gams g.scr o=gx.scr lo=0 gdx=soleps && mv soleps.gdx ..'; Set s Solutions /1*50/; Parameter solutions(s,k) Unique solutions; execute_load 'soleps', solutions; display solutions; $exit * The display should produce a table with 18 unique solutions: ---- 203 PARAMETER solutions Unique solutions cost CO2emissi~ endogenous 1 3075000.000 62460.000 31000.000 2 3078000.000 62316.000 31200.000 3 3099000.000 61308.000 32600.000 4 3111000.000 60732.000 33400.000 5 3120000.000 60300.000 34000.000 6 3141000.000 59292.000 35400.000 7 3147000.000 59004.000 35800.000 8 3162000.000 58284.000 36800.000 9 3183000.000 57276.000 38200.000 10 3204000.000 56268.000 39600.000 11 3219000.000 55548.000 40600.000 12 3225000.000 55260.000 41000.000 13 3315000.000 53820.000 39000.000 14 3423000.000 52092.000 36600.000 15 3531000.000 50364.000 34200.000 16 3639000.000 48636.000 31800.000 17 3747000.000 46908.000 29400.000 18 3855000.000 45180.000 27000.000