iswnm.gms : Indus Surface Water Network Submodule
This is the surface water network submodel of the integrated
Indus river basin model.
Reference:
- Duloy, J H, and O'Mara, G T, Issues of Efficiency and Interdependence in Water Resource Investments: Lessons from the Indus Basin of Pakistan. Tech. rep., The World Bank, 1984.
Large Model of Type: LP
$Title Indus Surface Water Network Submodule (ISWNM,SEQ=89)
$Stitle Network Nodes and Arc Definition
$Ontext
This is the surface water network submodel of the integrated
Indus river basin model.
Duloy, J H, and O'Mara, G T, Issues of Efficiency and Interdependence
in Water Resource Investments: Lessons from the Indus Basin of Pakistan.
Tech. rep., The World Bank, 1984.
$Offtext
Set n nodes of the indus river system/
feroz-b ferozepur barrage - sutlej river
sulem-b sulemanki barrage - sutlej river
islam-b islam barrage - sutlej river
panjnad-b panjnad barrage - panjnad river
ravi-i ravi inflow at madhopur - ravi river
mr-tail tail of marrala ravi link cannal - ravi river
balloki-b balloki barrage - ravi river
sidhnai-b sidhani barrage - ravi river
tp-tail tail of taunsa panjnad link canal - jhelum+chenab
marala-b marrala barrage - chenab river
khanki-b khanki barrage - chenab river
qadira-b qadirabad barrage - chenab river
trimmu-b trimmu barrage - chenab river
mangla-r mangla reservoir - jehlum river
rasul-b rasul barrage - jhelum river
cj-tail tail of chasma jehlum link - jehlum river
tarbela-r tarbela reservoir - indus river
amanda-h amandara head works - swat river
munda-h munda head works - swat river
warsak-d warsak reservoir - kabul river
k-s-jct kabul and swat river jct - kabul river
kabul-tail kabul river tail - indus river
kalabagh-r kalabagh reservoir - indus river
chasma-r chasma reservoir - indus river
taunsa-b taunsa barrage - indus river
mithankot indus and panjnad river jct - indus river
gudu-b gudu barrage - indus river
sukkur-b sukkur barrage - indus river
kotri-b kotri barrage - indus river
a-sea arabian sea
a1 diversion point for uj uj link and r.p.c
a2 div. for brbd link uc link and uc int.
a3 div. for mr cross link
a4 mr cross tail and brbd link
a5 div. for cbd and ud canals
a6 diversion to lcc feeder
a7 div. for gugera and jhang canals
a8 divesion point for maili+l pakpattan canals
a9 smb link to l-bahawl canal
a10 diversion point for lj
/
c irrigation canals in the indus river irrigation system/
ud upper dipalpur
cbd central bari doab canal
ray raya canal
uc upper chenab canal
mr marala ravi canal
sad sadiqia canal
foc fordwah canal
pak upper pakpattan+u-bahawal+qaim+u-mailsi canal
ld lower dipalpur canal
lbd lower bari doab canal
jha jhang canal (lcc)
gug gugera branch canal (lcc)
uj upper jehlum canal
lj lower jehlum canal
bah bahawal canal
mai lowwer mailsi+ lower pakpattan canal
sid sidhnai canal
hav haveli canal
ran rangpur canal
pan panjnad canal
abb abbasia canal
lsw lower swat canal
usw upper swat canal
war warsak canal
kab kabul river canal
tha thal canal
pah paharpur canal
muz muzffgarh canal
dgk dera ghazi khan canal
p+d pat plus desert canal
beg begari canal
gho ghotki canal
nw north west canal
ric rice canal
dad dadu canal
kw khairpur west canal
ke khairpur east canal
roh rohri canal
nar nara canal
kal kalri canal
lch lined channel
ful fuleli canal
pin pinyari canal/
i system inflows /
swat swat river at chakdara
kabul kabul river at warsak
indus indus river at tarbela
haro haro river at gariall
soan soan river at dhok pathan
jehlum jehlum river at mangls
chenab chenab river at marrala
ravi ravi river below madhopur
sutlej sutlej river below ferozpur /
nc(n,c) node to canal map/
sulem-b. (sad,foc,pak), a8. mai
a9. bah , panjnad-b. (pan,abb)
balloki-b. (lbd,ld) , sidhnai-b. sid
marala-b. mr , a2. (uc,ray)
a5. (cbd,ud) , a7. (jha,gug)
trimmu-b. (ran,hav)
a1. uj , a10. lj
amanda-h. usw , munda-h. lsw
warsak-d. war , k-s-jct. kab
kalabagh-r. tha , chasma-r. pah
taunsa-b. (muz,dgk) , gudu-b. (p+d,beg,gho)
sukkur-b. (nw,ric,dad,kw,ke,roh,nar)
kotri-b. (kal,lch,ful,pin)/
;
Alias (n,n1);
Set nn(n,n1) water flow system node to node /
*-- sutlej ravi system
sulem-b. (feroz-b, balloki-b)
islam-b. sulem-b
a9. (a8, islam-b)
a8. sidhnai-b
panjnad-b. (tp-tail, islam-b)
*-- ravi chenab system
ravi-i. a3
a3. marala-b
a4. (a3,a2)
a5. a4
a2. marala-b
balloki-b. (ravi-i, a2, a6)
a6. qadira-b
a7. (a6, khanki-b)
sidhnai-b. (trimmu-b, balloki-b)
*-- chenab jehlum system
khanki-b. (a1, marala-b)
qadira-b. (rasul-b, khanki-b)
trimmu-b. (qadira-b, cj-tail)
tp-tail. (trimmu-b, sidhnai-b)
a1. mangla-r
rasul-b. mangla-r
a10. (rasul-b, a1)
cj-tail. (rasul-b, chasma-r)
*-- kabul swat system
munda-h. amanda-h
k-s-jct. (munda-h, warsak-d)
*-- indus river
kabul-tail. (k-s-jct, tarbela-r)
kalabagh-r. kabul-tail
chasma-r. kalabagh-r
taunsa-b. chasma-r
mithankot. (panjnad-b,taunsa-b)
gudu-b. mithankot
sukkur-b. gudu-b
kotri-b. sukkur-b
a-sea. kotri-b /
ni(n,i) node to rim station inflow map /
amanda-h. swat , warsak-d. kabul,
tarbela-r. indus , kabul-tail. haro
kalabagh-r. soan , mangla-r. jehlum
marala-b. chenab , ravi-i. ravi
feroz-b. sutlej /
e / pex pan evaporation
hcx height of water in link canal from sea(feet)
hwr height of groundwater from sea (feet)/
m months /jan,feb,mar,apr,may,jun,jul,aug,sep,oct,nov,dec/
s seasons / rabi,kharif /
sm(s,m) season to months mapping
/rabi.(jan,feb,mar,oct,nov,dec)
kharif.(apr,may,jun,jul,aug,sep)/
nb(n) ;
nb(n) = yes; nb("a-sea")=no;
$Stitle flow capacities
Parameter ccap(c) canal capacity at the canal head (maf)/
ud .131, cbd .163, ray .110, uc .506
mr .166, sad .332, foc .204, pak .478
ld .244, lbd .518, jha .410, gug .433
uj .345, lj .464, bah .346, mai .362
sid .268, hav .068, ran .176, pan .671
abb .080, usw .117, lsw .060, war .044
kab .027, tha .577, pah .037, muz .495
dgk .529, p+d .799, beg 1.155, gho .648
nw .566, ric .829, dad .319, kw .157
ke .207, roh .981, nar .873, kal .546
lch .205, ful .894, pin .831/
ncap(n,n1) node to node transfer capacity (maf)/
chasma-r. cj-tail 1.307, taunsa-b. tp-tail .724
mangla-r. a1 .685, a1. a10 .199
rasul-b. a10 .328, a1. khanki-b .422
rasul-b. qadira-b 1.232,
marala-b. a3 .985, a3. a4 .199
a3. ravi-i .938, marala-b. a2 .995
a2. balloki-b .698, a2. a4 .310
a4. a5 .310
khanki-b. a7 .499, qadira-b. a6 1.146
a6. a7 .270, a6. balloki-b .808
balloki-b. sulem-b 1.172, trimmu-b. sidhnai-b 1.03
sidhnai-b. a8 .662, a8. a9 .640
islam-b. a9 .299 /
;
Display n,c,nc,nn, ni;
Display ccap, ncap ;
$Stitle loss coefficient calculations for link canals
*- following calculation are to compute loss coefficients coeffl(n1,n,m)
* all the data needed for these calculations is given below except
* link canal capacity is from above
*
Table madjust(n1,n,m) monthly adjustment factor for operational losses
jan feb mar apr may jun jul aug sep oct nov dec
chasma-r.cj-tail 4 4 4 4 5 6 6 6 5 4 4 4
taunsa-b.tp-tail 4 4 4 4 5 6 6 6 5 4 4 4
mangla-r.a1 4 4 4 4 5 6 6 6 5 4 4 4
a1.khanki-b 4 4 4 4 5 6 6 6 5 4 4 4
rasul-b.qadira-b 4 4 4 4 5 6 6 6 5 4 4 4
marala-b.a3 4 4 4 4 5 6 6 6 5 4 4 4
a3.ravi-i 4 4 4 4 5 6 6 6 5 4 4 4
marala-b.a2 4 4 4 4 5 6 6 6 5 4 4 4
a2.balloki-b 4 4 4 4 5 6 6 6 5 4 4 4
a3.a4 4 4 4 4 5 6 6 6 5 4 4 4
a2.a4 4 4 4 4 5 6 6 6 5 4 4 4
a4.a5 4 4 4 4 5 6 6 6 5 4 4 4
khanki-b.a7 4 4 4 4 5 6 6 6 5 4 4 4
qadira-b.a6 4 4 4 4 5 6 6 6 5 4 4 4
a6.balloki-b 4 4 4 4 5 6 6 6 5 4 4 4
a6.a7 4 4 4 4 5 6 6 6 5 4 4 4
balloki-b.sulem-b 4 4 4 4 5 6 6 6 5 4 4 4
trimmu-b.sidhnai-b 4 4 4 4 5 6 6 6 5 4 4 4
sidhnai-b.a8 2 2 2 2 3 3 3 3 3 2 2 2
a8.a9 2 2 2 2 3 3 3 3 3 2 2 2
rasul-b.a10 4 4 4 4 5 6 6 6 5 4 4 4
a1.a10 4 4 4 4 5 6 6 6 5 4 4 4
Table linkpar(e,n1,n,m) evaporation(ft) height of canal and gw(ft)
jan feb mar apr may jun
pex.chasma-r.cj-tail 0.260 0.331 0.517 0.760 1.057 1.143
pex.taunsa-b.tp-tail 0.260 0.331 0.517 0.760 1.057 1.143
pex.mangla-r.a1 0.240 0.306 0.531 0.752 0.973 1.018
pex.a1.khanki-b 0.240 0.306 0.531 0.752 0.973 1.018
pex.rasul-b.qadira-b 0.240 0.306 0.531 0.752 0.973 1.018
pex.marala-b.a3 0.208 0.297 0.517 0.762 0.957 0.998
pex.a3.ravi-i 0.208 0.297 0.517 0.762 0.957 0.998
pex.marala-b.a2 0.208 0.297 0.517 0.762 0.957 0.998
pex.a2.balloki-b 0.208 0.297 0.517 0.762 0.957 0.998
pex.a3.a4 0.208 0.297 0.517 0.762 0.957 0.998
pex.a2.a4 0.208 0.297 0.517 0.762 0.957 0.998
pex.a4.a5 0.243 0.313 0.565 0.785 0.975 1.048
pex.khanki-b.a7 0.208 0.297 0.517 0.762 0.957 0.998
pex.qadira-b.a6 0.208 0.297 0.517 0.762 0.957 0.998
pex.a6.balloki-b 0.208 0.297 0.517 0.762 0.957 0.998
pex.a6.a7 0.208 0.297 0.517 0.762 0.957 0.998
pex.balloki-b.sulem-b 0.243 0.313 0.565 0.785 0.975 1.048
pex.trimmu-b.sidhnai-b 0.214 0.310 0.526 0.769 0.964 1.008
pex.sidhnai-b.a8 0.260 0.331 0.583 0.813 1.002 1.051
pex.a8.a9 0.260 0.331 0.583 0.813 1.002 1.051
pex.rasul-b.a10 0.240 0.306 0.531 0.752 0.973 1.018
pex.a1.a10 0.240 0.306 0.531 0.752 0.973 1.018
hcx.chasma-r.cj-tail 648.32 650.13 650.60 651.31 651.73 652.01
hcx.taunsa-b.tp-tail 409.40 410.55 410.85 411.29 411.56 411.73
hcx.mangla-r.a1 630.16 630.54 630.41 630.93 631.85 631.94
hcx.a1.khanki-b 630.16 630.54 630.41 630.93 631.85 631.94
hcx.rasul-b.qadira-b 630.16 630.54 630.41 630.93 631.85 631.94
hcx.marala-b.a3 669.05 669.07 669.34 670.22 671.23 672.12
hcx.a3.ravi-i 669.05 669.07 669.34 670.22 671.23 672.12
hcx.marala-b.a2 669.05 669.07 669.34 670.22 671.23 672.12
hcx.a2.balloki-b 669.05 669.07 669.34 670.22 671.23 672.12
hcx.a3.a4 669.05 669.07 669.34 670.22 671.23 672.12
hcx.a2.a4 669.05 669.07 669.34 670.22 671.23 672.12
hcx.a4.a5 628.69 629.09 628.92 629.72 631.18 631.95
hcx.khanki-b.a7 669.05 669.07 669.34 670.22 671.23 672.12
hcx.qadira-b.a6 669.05 669.07 669.34 670.22 671.23 672.12
hcx.a6.balloki-b 669.05 669.07 669.34 670.22 671.23 672.12
hcx.a6.a7 669.05 669.07 669.34 670.22 671.23 672.12
hcx.balloki-b.sulem-b 628.69 629.09 628.92 629.72 631.18 631.95
hcx.trimmu-b.sidhnai-b 540.08 540.94 541.66 541.67 541.95 542.23
hcx.sidhnai-b.a8 454.64 455.00 455.55 455.68 456.00 456.57
hcx.a8.a9 454.64 455.00 455.55 455.68 456.00 456.57
hcx.rasul-b.a10 630.16 630.54 630.41 630.93 631.85 631.94
hcx.a1.a10 630.16 630.54 630.41 630.93 631.85 631.94
hwr.chasma-r.cj-tail 640.0 640.0 640.0 640.0 640.0 640.0
hwr.taunsa-b.tp-tail 403.0 403.0 403.0 403.0 403.0 403.0
hwr.mangla-r.a1 620.0 620.0 620.0 620.0 620.0 620.0
hwr.a1.khanki-b 620.0 620.0 620.0 620.0 620.0 620.0
hwr.rasul-b.qadira-b 620.0 620.0 620.0 620.0 620.0 620.0
hwr.marala-b.a3 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a3.ravi-i 655.0 655.0 655.0 655.0 655.0 655.0
hwr.marala-b.a2 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a2.balloki-b 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a3.a4 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a2.a4 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a4.a5 613.0 613.0 613.0 613.0 613.0 613.0
hwr.khanki-b.a7 655.0 655.0 655.0 655.0 655.0 655.0
hwr.qadira-b.a6 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a6.balloki-b 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a6.a7 655.0 655.0 655.0 655.0 655.0 655.0
hwr.balloki-b.sulem-b 613.0 613.0 613.0 613.0 613.0 613.0
hwr.trimmu-b.sidhnai-b 523.0 523.0 523.0 523.0 523.0 523.0
hwr.sidhnai-b.a8 435.0 435.0 435.0 435.0 435.0 435.0
hwr.a8.a9 435.0 435.0 435.0 435.0 435.0 435.0
hwr.rasul-b.a10 620.0 620.0 620.0 620.0 620.0 620.0
hwr.a1.a10 620.0 620.0 620.0 620.0 620.0 620.0
+ jul aug sep oct nov dec
pex.chasma-r.cj-tail 1.057 0.899 0.721 0.631 0.402 0.245
pex.taunsa-b.tp-tail 1.057 0.899 0.721 0.631 0.402 0.245
pex.mangla-r.a1 0.894 0.793 0.717 0.583 0.354 0.232
pex.a1.khanki-b 0.894 0.793 0.717 0.583 0.354 0.232
pex.rasul-b.qadira-b 0.894 0.793 0.717 0.583 0.354 0.232
pex.marala-b.a3 0.835 0.745 0.679 0.533 0.329 0.217
pex.a3.ravi-i 0.835 0.745 0.679 0.533 0.329 0.217
pex.marala-b.a2 0.835 0.745 0.679 0.533 0.329 0.217
pex.a2.balloki-b 0.835 0.745 0.679 0.533 0.329 0.217
pex.a3.a4 0.835 0.745 0.679 0.533 0.329 0.217
pex.a2.a4 0.835 0.745 0.679 0.533 0.329 0.217
pex.a4.a5 0.934 0.843 0.750 0.579 0.364 0.264
pex.khanki-b.a7 0.835 0.745 0.679 0.533 0.329 0.217
pex.qadira-b.a6 0.835 0.745 0.679 0.533 0.329 0.217
pex.a6.balloki-b 0.835 0.745 0.679 0.533 0.329 0.217
pex.a6.a7 0.835 0.745 0.679 0.533 0.329 0.217
pex.balloki-b.sulem-b 0.934 0.843 0.750 0.579 0.364 0.264
pex.trimmu-b.sidhnai-b 0.826 0.741 0.683 0.554 0.326 0.226
pex.sidhnai-b.a8 0.952 0.898 0.762 0.604 0.385 0.273
pex.a8.a9 0.952 0.898 0.762 0.604 0.385 0.273
pex.rasul-b.a10 0.894 0.793 0.717 0.583 0.354 0.232
pex.a1.a10 0.894 0.793 0.717 0.583 0.354 0.232
hcx.chasma-r.cj-tail 652.33 651.92 651.79 652.06 651.75 649.83
hcx.taunsa-b.tp-tail 411.94 411.67 411.59 411.76 411.57 410.36
hcx.mangla-r.a1 632.27 632.12 632.02 631.25 630.76 630.69
hcx.a1.khanki-b 632.27 632.12 632.02 631.25 630.76 630.69
hcx.rasul-b.qadira-b 632.27 632.12 632.02 631.25 630.76 630.69
hcx.marala-b.a3 671.97 671.95 671.74 669.81 668.93 668.80
hcx.a3.ravi-i 671.97 671.95 671.74 669.81 668.93 668.80
hcx.marala-b.a2 671.97 671.95 671.74 669.81 668.93 668.80
hcx.a2.balloki-b 671.97 671.95 671.74 669.81 668.93 668.80
hcx.a3.a4 671.97 671.95 671.74 669.81 668.93 668.80
hcx.a2.a4 671.97 671.95 671.74 669.81 668.93 668.80
hcx.a4.a5 632.10 631.88 631.92 630.60 628.97 628.69
hcx.khanki-b.a7 671.97 671.95 671.74 669.81 668.93 668.80
hcx.qadira-b.a6 671.97 671.95 671.74 669.81 668.93 668.80
hcx.a6.balloki-b 671.97 671.95 671.74 669.81 668.93 668.80
hcx.a6.a7 671.97 671.95 671.74 669.81 668.93 668.80
hcx.balloki-b.sulem-b 632.10 631.88 631.92 630.60 628.97 628.69
hcx.trimmu-b.sidhnai-b 542.01 541.75 542.06 541.88 541.61 541.23
hcx.sidhnai-b.a8 457.19 457.13 457.07 456.22 455.45 454.81
hcx.a8.a9 457.19 457.13 457.07 456.22 455.45 454.81
hcx.rasul-b.a10 632.27 632.12 632.02 631.25 630.76 630.69
hcx.a1.a10 632.27 632.12 632.02 631.25 630.76 630.69
hwr.chasma-r.cj-tail 640.0 640.0 640.0 640.0 640.0 640.0
hwr.taunsa-b.tp-tail 403.0 403.0 403.0 403.0 403.0 403.0
hwr.mangla-r.a1 620.0 620.0 620.0 620.0 620.0 620.0
hwr.a1.khanki-b 620.0 620.0 620.0 620.0 620.0 620.0
hwr.rasul-b.qadira-b 620.0 620.0 620.0 620.0 620.0 620.0
hwr.marala-b.a3 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a3.ravi-i 655.0 655.0 655.0 655.0 655.0 655.0
hwr.marala-b.a2 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a2.balloki-b 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a3.a4 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a2.a4 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a4.a5 613.0 613.0 613.0 613.0 613.0 613.0
hwr.khanki-b.a7 655.0 655.0 655.0 655.0 655.0 655.0
hwr.qadira-b.a6 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a6.balloki-b 655.0 655.0 655.0 655.0 655.0 655.0
hwr.a6.a7 655.0 655.0 655.0 655.0 655.0 655.0
hwr.balloki-b.sulem-b 613.0 613.0 613.0 613.0 613.0 613.0
hwr.trimmu-b.sidhnai-b 523.0 523.0 523.0 523.0 523.0 523.0
hwr.sidhnai-b.a8 435.0 435.0 435.0 435.0 435.0 435.0
hwr.a8.a9 435.0 435.0 435.0 435.0 435.0 435.0
hwr.rasul-b.a10 620.0 620.0 620.0 620.0 620.0 620.0
hwr.a1.a10 620.0 620.0 620.0 620.0 620.0 620.0
Set e1 /length, width /
Table lw(n1,n,e1) length(miles) and width( feet) of link canals
length width
chasma-r.cj-tail 56 362
taunsa-b.tp-tail 39 190
mangla-r.a1 44 180
a1.khanki-b 36 120
rasul-b.qadira-b 27 350
marala-b.a3 56.8 250
a3.ravi-i 4 250
marala-b.a2 23 250
a2.balloki-b 68 150
a3.a4 4 50
a2.a4 35.2 90
a4.a5 75.6 90
khanki-b.a7 41.6 120
qadira-b.a6 14 320
a6.balloki-b 55 160
a6.a7 18 90
balloki-b.sulem-b 47 325
trimmu-b.sidhnai-b 41 253
sidhnai-b.a8 39 140
a8.a9 26 90
rasul-b.a10 12 100
a1.a10 15 50
Parameter caf conversion factor from cfs to acre feet per month
cmft conversion from mile-feet to acre-feet
per permeability in cfs per square feet
philc seepage proportionality contant
coeffl node to node transfer efficiency for link canals
;
* note : canal mile = 5000 feet
caf = 3600*24*30/43560 ; cmft = 5000/43560 ;
per = 2e-5 ;
Set g / 1,2,3,4,5,6/
Table function(*,g) function of canal width
1 2 3 4 5 6
input 0 10 30 100 300 500
output 0 .36 .67 .90 1.30 1.90
Parameter step grid point for function
ftn function value
ftna interpolated function output
ftni function input
ftno function output
;
ftni(g) = function("input",g); ftno(g) = function("output",g);
step(n1,n,g) = (ftni(g) le lw(n1,n,"width")) and
(ftni(g+1) gt lw(n1,n,"width") );
ftna(n1,n,g) = (ftno(g) +(lw(n1,n,"width")-ftni(g))*(ftno(g+1)-
ftno(g))/(ftni(g+1)-ftni(g)))$step(n1,n,g);
ftn(n1,n) = sum(g, ftna(n1,n,g)) ;
philc(n1,n) = lw(n1,n,"length")*5000*ftn(n1,n)*per*caf;
coeffl(n1,n,m)$(ncap(n1,n) ne 0) =1-(lw(n1,n,"length")*lw(n1,n,"width")
*cmft*linkpar("pex",n1,n,m) + philc(n1,n)*madjust(n1,n,m)*(
linkpar("hcx",n1,n,m)-linkpar("hwr",n1,n,m)))/
ncap(n1,n)/1000000;
Display coeffl ;
*-- link canal loss calculations finished
$Stitle runoff and seepage
Table seepage(n1,n,m) seepage from river reaches(000 acre feet)
jan feb mar apr may jun
sukkur-b.kotri-b 2.0
gudu-b.sukkur-b -11.0 -10.5 2.0 2.0
taunsa-b.mithankot -6.3 -7.5 3.2 1.6
tp-tail.panjnad-b -14.3 -16.6 0.8 0.4
kalabagh-r.chasma-r -39.8 -36.0 0.2 0.2
chasma-r.taunsa-b -154.2 -159.0 3.8 0.8
sidhnai-b.tp-tail -16.5 -17.4
trimmu-b.tp-tail -0.6
panjnad-b.mithankot 1.0 1.0 1.0 1.0
islam-b.panjnad-b
sulem-b.islam-b -127.0 -127.0
balloki-b.sidhnai-b -120.0 -120.0
ravi-i.balloki-b
qadira-b.trimmu-b -1.5 -2.2 -0.4 -0.9 -0.9 1.1
khanki-b.qadira-b -1.2 -1.2 -0.4 -0.4 1.2
marala-b.khanki-b 3.0 -1.0 -1.0 3.0
rasul-b.cj-tail -0.9 -0.4 -0.4 -0.4 -0.4
cj-tail.trimmu-b -0.1 -0.2 -0.2 -0.2 -0.2
mangla-r.rasul-b -0.3 -0.3 -0.1 -0.1 0.3
amanda-h.munda-h -54.0 -54.0
munda-h.k-s-jct -41.0 -41.0
warsak-d.k-s-jct -18.0 -18.0
k-s-jct.kabul-tail -7.0 -7.0
+ jul aug sep oct nov dec
sukkur-b.kotri-b 9.0 3.0 16.0 7.0 1.0
gudu-b.sukkur-b 8.0 14.0 18.0 -8.0 -9.0
taunsa-b.mithankot -0.6 3.2 13.8 24.4 -2.8 -5.3
tp-tail.panjnad-b -1.4 0.8 0.3 5.6 -16.2 -16.4
kalabagh-r.chasma-r 0.1 2.2 3.2 -35.0 -35.6
chasma-r.taunsa-b 2.9 10.8 16.8 -154.0 -157.4
sidhnai-b.tp-tail -1.8 -16.5 -16.5
trimmu-b.tp-tail -1.2
panjnad-b.mithankot 2.0 4.0 7.0 4.0 2.0
islam-b.panjnad-b 8.0
sulem-b.islam-b 12.0 -127.0 -127.0
balloki-b.sidhnai-b 5.0 -120.0 -120.0
ravi-i.balloki-b 5.0
qadira-b.trimmu-b -6.1 1.0 6.1 5.1 -0.7
khanki-b.qadira-b -3.7 0.8 0.4 0.8 -0.6 -0.6
marala-b.khanki-b -9.0 2.0 5.0 2.0
rasul-b.cj-tail -0.9 1.3 4.7 0.9
cj-tail.trimmu-b -0.4 0.6 2.2 0.4
mangla-r.rasul-b -0.9 0.2 1.0 2.0 -1.5 -1.5
amanda-h.munda-h -54.0 -54.0
munda-h.k-s-jct -41.0 -41.0
warsak-d.k-s-jct -18.0 -18.0
k-s-jct.kabul-tail -7.0 -7.0
$Eject
Table runoff(n,m) rainfall runoff to nodes (000 af)
jan feb mar apr may jun
chasma-r 4.2 4.5 5.1 3.5 2.6 5.4
taunsa-b 22.8 28.4 36.5 25.8 17.5 30.4
gudu-b 9.1 10.4 11.0 7.4 6.5 10.6
rasul-b 2.2 2.2 2.3 1.6 1.3 2.8
trimmu-b 36.5 36.2 36.5 26.0 22.5 53.9
panjnad-b 10.6 12.3 14.7 9.9 8.4 14.0
khanki-b 6.5 6.2 6.0 4.2 3.8 9.3
qadira-b 6.5 6.2 6.0 4.2 3.8 9.3
balloki-b 23.3 21.5 20.5 14.6 14.0 35.9
sidhnai-b 15.7 16.1 16.4 12.2 11.5 26.5
sulem-b 8.9 6.0 7.7 5.5 5.2 13.7
islam-b 13.7 13.5 13.9 9.6 8.4 20.0
tp-tail 9.0 9.5 9.4 6.7 7.5 13.4
cj-tail 22.7 22.4 24.2 16.6 13.2 28.3
kabul-tail 30.7 32.7 52.1 37.6 16.4 6.6
+ jul aug sep oct nov dec
chasma-r 19.3 19.5 7.0 .8 .7 1.8
taunsa-b 111.6 102.0 34.6 5.1 5.5 11.4
gudu-b 55.5 52.3 9.3 1.0 3.1 5.8
rasul-b 9.8 10.4 3.7 .4 .3 .9
trimmu-b 170.4 191.0 71.4 7.2 5.1 15.5
panjnad-b 86.4 70.2 12.8 1.6 3.7 6.2
khanki-b 29.9 33.5 12.6 1.2 .8 2.6
qadira-b 29.9 33.5 12.6 1.2 .8 2.6
balloki-b 113.0 126.9 48.3 4.6 3.1 9.8
sidhnai-b 94.4 95.5 34.1 3.4 3.5 8.4
sulem-b 52.1 47.3 17.8 1.9 2.6 4.2
islam-b 93.4 80.7 24.2 2.5 3.2 6.6
tp-tail 49.1 48.6 16.9 2.0 1.5 5.4
cj-tail 100.7 105.3 38.0 4.4 3.2 9.1
kabul-tail 26.9 43.3 17.3 4.9 6.6 14.3
$Stitle rim station inflows and tributories
Table inflow(i,m) system inflows measured atthe rim stations (maf)
jan feb mar apr may jun
swat 0.081 0.078 0.124 0.329 0.588 0.760
kabul 0.395 0.297 0.297 0.862 2.171 3.038
indus 0.979 0.954 1.183 1.618 2.716 8.227
haro 0.021 0.023 0.033 0.030 0.016 0.041
soan 0.020 0.025 0.035 0.027 0.012 0.032
jehlum 0.450 0.543 1.213 2.037 2.921 3.990
chenab 0.419 0.607 1.096 1.732 2.049 2.813
ravi .131 .129 .168 .069 .057 .149
sutlej .0 .021 .111 .190 .360 .375
+ jul aug sep oct nov dec
swat 0.908 0.850 0.518 0.226 0.128 0.103
kabul 2.928 2.413 1.576 0.820 0.524 0.458
indus 13.540 13.039 9.306 4.518 1.837 1.206
haro 0.089 0.142 0.128 0.058 0.027 0.020
soan 0.164 0.404 0.293 0.033 0.013 0.016
jehlum 4.039 2.898 1.938 1.255 0.782 0.620
chenab 4.610 5.286 3.492 1.284 0.400 0.343
ravi .526 2.051 1.994 .510 .214 .154
sutlej .340 1.535 2.63 1.348 .028 .0
Table trib(n1,n,m) tributory inflows (maf)
jan feb mar apr may jun
marala-b.khanki-b 0.007 0.006 0.007 0.050 0.141 0.731
mangla-r.rasul-b 0.120 0.180 0.150
balloki-b.sidhnai-b 0.005 0.007 0.006 0.001 0.009
amanda-h.munda-h 0.115 0.105 0.249 0.278 0.418 0.596
munda-h.k-s-jct 0.004 0.003 0.009 0.014 0.011 0.006
warsak-d.k-s-jct 0.032 0.029 0.059 0.113 0.093 0.054
tarbela-r.kalabagh-r 0.064 0.077 0.121 0.073 0.067 0.079
+ jul aug sep oct nov dec
marala-b.khanki-b 0.691 0.859 0.409 0.017 0.007 0.008
mangla-r.rasul-b 0.170 0.320 0.210 0.060
balloki-b.sidhnai-b 0.096 0.206 0.040 0.002 0.003 0.009
amanda-h.munda-h 0.687 0.247 0.103 0.105 0.114 0.232
munda-h.k-s-jct 0.007 0.006 0.006 0.004 0.004 0.004
warsak-d.k-s-jct 0.063 0.051 0.046 0.036 0.032 0.033
tarbela-r.kalabagh-r 0.379 0.740 0.190 0.080 0.045 0.069
$Stitle reservoir chracteristics
Parameter rcap(n) live capacity of reservoirs (maf)/
tarbela-r 9.093
mangla-r 5.251
chasma-r 0.500 /
ircont(n) initial reservoir contenst (maf)/
tarbela-r 9.093
mangla-r 5.251
chasma-r 0.500 /
Table rulelo(n,m) lower rule curve(ratio of reservoir contents to capacity)
jan feb mar apr may jun jul aug sep oct nov dec
tarbela-r 43 30 14 4 0 10 46 100 100 64 59 53
chasma-r 0 0 0 0 0 0 0 0 0 0 0 0
mangla-r 16 6 0 7 21 48 74 95 83 55 35 24
Table ruleup(n,m) upper rule curve
jan feb mar apr may jun jul aug sep oct nov dec
tarbela-r 69 47 37 26 13 48 73 100 100 100 87 77
chasma-r 100 100 100 100 100 100 100 100 100 100 100 100
mangla-r 39 28 19 31 42 59 87 100 100 90 68 49
Table revapl(n,m) evaporation losses from reservoirs in 000 af
jan feb mar apr may jun jul aug sep oct nov dec
tarbela-r 1 5 7 9 16 28 10 1 12 29 12 5
chasma-r 3 3 1 6 3 7 15 6 3
mangla-r 1 5 4 5 12 17 -1.9 -2.5 4 22 10 50
$Stitle report on the input data
Parameter rep1
rep2
;
rep1(i,m) = inflow(i,m); rep1(i,s)=sum(m$sm(s,m), inflow(i,m));
rep1(i,"annual") = sum(m, inflow(i,m) );
rep1("total",m) = sum(i, rep1(i,m));
rep1("total",s) = sum(i, rep1(i,s));
rep1("total","annual") = sum(s, rep1("total", s)) ;
display " system inflows at rim stations maf ", rep1;
rep1(i,m) = 0; rep1(i,s) = 0; rep1(i,"annual")=0;
rep1(n,m) = runoff(n,m); rep1(n,s)=sum(m$sm(s,m), runoff(n,m));
rep1(n,"annual") = sum(m, runoff(n,m)) ;
rep1("total",m) = sum(n, rep1(n,m));
rep1("total",s) = sum(n, rep1(n,s));
rep1("total","annual") = sum(s, rep1("total", s)) ;
display " runoff to nodes from rainfall 000 af", rep1;
rep1(n,m) = 0; rep1(n,s) = 0; rep1(n,"annual")=0;
*
rep2(n,n1,m)=trib(n,n1,m); rep2(n,n1,s) = sum(m$sm(s,m), trib(n,n1,m));
rep2(n,n1,"annual") = sum(s, rep2(n,n1,s) );
display " tributory inflow in maf", rep2;
rep2(n,n1,m) = 0; rep2(n,n1,s) = 0; rep2(n,n1,"annual")=0;
rep2(n,n1,m)=seepage(n,n1,m);
rep2(n,n1,s)=sum(m$sm(s,m), seepage(n,n1,m));
rep2(n,n1,"annual") = sum(s, rep2(n,n1,s) );
display " seepage from/to river reaches 000 af", rep2;
rep2(n,n1,m) = 0; rep2(n,n1,s) = 0; rep2(n,n1,"annual")=0;
$Stitle model definition
Positive Variables
rcont(n,m) end of the month reservoir contents (maf)
canaldiv(c,m) monthly diversion to canal (maf)
f(n,n1,m) flow to node n from node n1 (maf)
variable vol total reservoir volumne
Equations nbal(n,m) water balance at a node (maf)
defvol ;
defvol.. vol =e= sum((n,m)$rcap(n), rcont(n,m));
;
nbal(n,m)$nb(n)..
sum(i$ni(n,i), inflow(i,m)) + runoff(n,m)/1000 +
sum(n1, trib(n,n1,m)) + sum(n1$nn(n,n1),
f(n,n1,m)*coeffl(n1,n,m)$coeffl(n1,n,m) + (f(n,n1,m) -
seepage(n1,n,m)/1000 )$(coeffl(n1,n,m) eq 0)) -
sum(n1$nn(n1,n), f(n1,n,m)) +
(rcont(n,m--1) -rcont(n,m)-revapl(n,m)/1000)$rcap(n)-
sum(c$nc(n,c), canaldiv(c,m)) =e= 0 ;
canaldiv.up(c,m) = ccap(c);
f.up(n,n1,m) = inf ;
f.up(n,n1,m)$( ncap(n1,n) ne 0 ) = ncap(n1,n);
rcont.lo(n,m) = rulelo(n,m)*rcap(n)/100 ;
rcont.up(n,m) = ruleup(n,m)*rcap(n)/100 ;
rcont.fx(n,"sep")$rcap(n) = ircont(n) ;
model canal / all /; solve canal max vol using lp;