shale.gms : Investment Planning in the Oil Shale Industry
This model analyses the syncrude potential of the Piceance basin in
northwest Colorado. The basin contains roughly 600 billion barrels
of recoverable oil in the form of shale oil. Stringent water and air
quality standards are imposed on the development of the industry.
Reference:
- Melton, J W, An Investment Planning Model for an Oil Shale Industry in the Piceance Basin. PhD thesis, Center for Economic Research, University of Texas, 1982.
Small Model of Type: LP
$Title Investment Planning in the Oil Shale Industry (SHALE,SEQ=46)
$Stitle set definitions
$Ontext
This model analyses the syncrude potential of the Piceance basin in
northwest Colorado. The basin contains roughly 600 billion barrels
of recoverable oil in the form of shale oil. Stringent water and air
quality standards are imposed on the development of the industry.
Melton, J W, An Investment Planning Model for an Oil Shale Industry in
the Piceance Basin. PhD thesis, Center for Economic Research, University
of Texas, 1982.
$Offtext
Set c commodities /
syncrude refined crude (mil bbls)
lpg liquefied petroleum gas (million bbls)
ammonia ammonia (mil tons)
coke coke (mil tons)
sulfur sulfur (mil tons)
shale-25 shale in place assaying 25 gallons per ton - gpt (mil tons)
shale-30 shale in place assaying 30 gallons per ton - gpt (mil tons)
shale-35 shale in place assaying 35 gallons per ton - gpt (mil tons)
sur-water surface water (mil bbls)
mo-water missouri river water (mil bbls)
grnd-water ground (underground) water (mil bbls)
mined-25 mined and crushed shale - 25 gpt (mil tons)
mined-30 mined and crushed shale - 30 gpt (mil tons)
mined-35 mined and crushed shale - 35 gpt (mil tons)
water water from all sources (mil bbls)
shale-oil shale-oil needing upgrading (mil bbls)
spentshale shale spoils needing disposal (mil tons)
part particulate emissions (kilos)
so2 sulfur dioxide emissions (kilos)
misc-act-i input to ancillary operations
can-space existing canyon space (mil cubic yards)
mine-fill spoils backfilled in mines (million cu yards)
spoil-dist spoils taken to a distant site (million tons)
part-red particulate pollutants after reduction
so2-red so2 emissions after reductions /
cf(c) final products / syncrude , lpg , ammonia , coke , sulfur /
crs(c) shale / shale-25 , shale-30 , shale-35 /
crr(c) renewable water supply / sur-water , mo-water /
crrs(c) surface water / sur-water /
crrm(c) missouri river water / mo-water /
crg(c) non-renewable groundwater / grnd-water /
ci(c) intermediate products / mined-25 , mined-30 , mined-35 , water , shale-oil , spentshale
part , so2 , misc-act-i /
cc(c) canyon space / can-space /
cd(c) spoils deposited underground or distantly (million cu yards) / mine-fill , spoil-dist /
er(c) reduced air pollution emissions (kilos) / part-red , so2-red /
p processes /
mining-25 mining - 25 gpt
mining-30 mining - 30 gpt
mining-35 mining - 35 gpt
ret-25 retorting - 25 gpt
ret-30 retorting - 30 gpt
ret-35 retorting - 35 gpt
buy-h2o-s buying surface water
buy-h2o-g buying ground water
buy-h2o-m buying water from the missouri river
upgrading upgrading of shale oil
dispose-c disposal of spoils in canyons
dispose-u disposal of spoils in mines
dispose-d disposal of spoils at a distant site
miscell operation of ancillaries
part-50 reduction of part emissions by fifty %
so2-50 reduction of so2 emissions by 50 %
part-90 reduction of part emissions by ninety %
so2-90 reduction of so2 emissions by 90 %
part-95 reduction of part emissions by ninety five %
so2-95 reduction of so2 emissions by 95 %
part-99 reduction of part emissions by ninety nine %
so2-99 reduction of so2 emissions by 99 %
part-99pt5 reduction of part emissions by 99 point 5 %
so2-99pt5 reduction of so2 emissions by 99 point 5 % /
prws(p) process of acquiring surface water / buy-h2o-s /
prwm(p) process of acquiring missouri river water / buy-h2o-m /
pgw(p) process of acquiring groundwater / buy-h2o-g /
pd(p) disposal activities / dispose-c , dispose-u , dispose-d /
pdu(p) underground disposal process / dispose-u /
pmu(p) mining processes which create mine space / mining-25 , mining-30 , mining-35 /
pp(p) pollution control processes / part-50 , part-90 , part-95 , part-99 , part-99pt5
so2-50 , so2-90 , so2-95 , so2-99 , so2-99pt5 /
m productive units / mine-25 , mine-30 , mine-35 , retort-25 , retort-30 , retort-35
h2o-s-eq , h2o-g-eq , h2o-m-eq , upgrader , disp-c-eq , disp-u-eq
disp-d-eq , misc-eq , part-50-eq, so2-50-eq , part-90-eq, so2-90-eq
part-95-eq, so2-95-eq , part-99-eq, so2-99-eq , p-99pt5-eq, s-99pt5-eq /
mrs(m) productive units used for surface water / h2o-s-eq /
mrm(m) productive units used for missouri river water / h2o-m-eq /
mrg(m) productive units used for groundwater / h2o-g-eq /
mp(m) productive units used in particulate control / part-50-eq , part-90-eq , part-95-eq , part-99-eq
p-99pt5-eq /
ms(m) productive units used in so2 control / so2-50-eq , so2-90-eq , so2-95-eq , so2-99-eq , s-99pt5-eq /
md(m) productive units used for disposal / disp-c-eq , disp-u-eq , disp-d-eq /
i index of break points for raw material purchases / i1*i5 /
tf expansion time periods / 1985-89 , 1990-94 , 1995-99 , 2000-04 , 2005-09 /
t(tf) time periods / 1990-94 , 1995-99 , 2000-04 , 2005-09 /
t1(tf) first two time periods / 1990-94 , 1995-99 /
Alias (t,tp),(tf,tfp);
$Stitle input-output data
Table a(c,p) input-output for processes and commodities
buy-h2o-s buy-h2o-g buy-h2o-m
sur-water -1
grnd-water -1
mo-water -1
water 1 1 1
+ mining-25 mining-30 mining-35
shale-25 -1.
shale-30 -1.
shale-35 -1.
water -.50 -.50 -.50
mined-25 1.
mined-30 1.
mined-35 1.
*mine-space .59 .59 .59
part 2.66 2.66 2.66
* notes:
* emissions source: ota p 262
* lbs/hr*(24/66000)*.454 = kilos per ton mined
* mine space: density of shale = 125 lbs/cu ft.
* ((2000/125)/27) = .5925 cu yd per ton mined
+ ret-25 ret-30 ret-35
mined-25 -1.
mined-30 -1.
mined-35 -1.
water -1.04 -1.04 -1.04
shale-oil .5952 .7143 .8333
spentshale .87 .85 .82
part 1.85 1.80 1.75
so2 .0177 .0213 .0248
* notes:
* assume particulate emissions are proportional to spentshale
* other emissions are proportional to shale-oil.
* emissions source: ota p 262
* lbs/hr*(24/66000)*.454 = kilos per ton of shale
* shale-oil source: exxon. 47000/66000 = .7121 bbl/ton of 35 gpt shale
* other grades of shale are linearly proportional
* spent shale source% whitcombe, et al p.51
* 35 gpt shale contains 359.3 lbs of organics
* 30 gpt shale contains 359.3*(30/35) lbs of organics
* 25 gpt shale contains 359.3*(25/35) lbs of organics
+ upgrading miscell
shale-oil -1.
water -.20
syncrude .84
misc-act-i .84 -1.
lpg .077
ammonia .0019
sulfur .0024
coke .0091
part .0018
so2 5.90
* emissions source: ota p 262
* syncrude source: sawyer (1979) p 55
* lb/hr*(24*50000)(.454*.84) = kilos per bbl of crude
+ dispose-c dispose-u dispose-d
spentshale -1. -1. -1.
water -1.18 -1.00 -.43
*mine-space -.82
can-space .82
mine-fill .82
spoil-dist 1.
part .245 .082
* note: spoils deposited in canyons and mines weighs 90 pounds
* per cubic foot. spoils deposited distantly
* weighs 75 pounds per cubic foot
* source: colony eis p. ix-19
* emissions source: ota p 262
* (.8400 ton of ss/.8333 bbl oil)*50000 = 60000 ton ss per day.
* lbs/hr*(24/60000)*.454 = kilos per ton of spent shale
*
* assume dispose-u has 1/3 the pollutants as dispose-c
* see cleveland cliffs (1978) p 97
* source: water for cispose-u - cleveland cliffs (1978) p 88
+ part-50 so2-50 part-90 so2-90 part-95 so2-95 part-99 so2-99 part-99pt5 so2-99pt5
part -1. -1 -1 -1 -1
so2 -1. -1 -1 -1 -1
part-red .5 .1 .05 .01 .005
so2-red .5 .1 .05 .01 .005
$Stitle capacity utilization data
Table b(m,p) productive unit capacity utilization
mining-25 mining-30 mining-35
mine-25 1
mine-30 1
mine-35 1
+ ret-25 ret-30 ret-35
retort-25 1
retort-30 1
retort-35 1
+ buy-h2o-s buy-h2o-g buy-h2o-m
h2o-s-eq 1
h2o-g-eq 1
h2o-m-eq 1
+ dispose-c dispose-u dispose-d
disp-c-eq 1
disp-u-eq 1
disp-d-eq 1
+ upgrading miscell
upgrader 1
misc-eq 1
+ part-50 so2-50 part-90 so2-90 part-95 so2-95 part-99 so2-99 part-99pt5 so2-99pt5
part-50-eq 1
part-90-eq 1
part-95-eq 1
part-99-eq 1
p-99pt5-eq 1
so2-50-eq 1
so2-90-eq 1
so2-95-eq 1
so2-99-eq 1
s-99pt5-eq 1
$Stitle data
Scalar theta years per time period / 5 /
ps royalty for lease: sawyer (1979) p. 54 ($ per barrel) / .25 /
prga cost of first unit of groundwater ($ per acre- foot) / 25 /
nutot cost of one 50000 bpd plant (billion $) / 3 /
days stream days per year / 330 /
prg cost of first unit of groundwater ($ per barrel)
Parameter prm(c) multiplier for final prices for raw materials: source: groundwater - ota p 392 /
*if 1.0 is the cost of the first unit, then these are the
*costs of the last unit. costs are linear between these
*points.
sur-water 24 , grnd-water 120 , mo-water 2 /
rw1(c) cost of first unit of renewable water ($ per acre-foot) / sur-water 300 , mo-water 9999999 /
rwesc(c) annual escalation in base cost of renewable water / sur-water .05 /
num(m) investment cost factors (fraction of nutot) /
(mine-25,mine-30,mine-35) .2
(retort-25,retort-30,retort-35) .26
h2o-s-eq .025
h2o-g-eq .05
h2o-m-eq .025
upgrader .26
disp-c-eq .004
disp-u-eq .002
disp-d-eq .008
*compare c and u with cleveland cliffs (1978) pp 95,105,108,164
misc-eq .254
part-50-eq .0022
so2-50-eq .0008
part-90-eq .0074
so2-90-eq .0026
part-95-eq .0096
so2-95-eq .0034
part-99-eq .0148
so2-99-eq .0052
p-99pt5-eq .017
s-99pt5-eq .006 /
nud(m) size (in daily input) of productive unit in 50k bpd plant /
(mine-25,mine-30,mine-35,retort-25,retort-30,retort-35) 71430
(h2o-s-eq,h2o-g-eq,h2o-m-eq) 251040
upgrader 59524
(disp-c-eq,disp-u-eq,disp-d-eq) 60000
misc-eq 50000
(part-50-eq,part-90-eq,part-95-eq,part-99-eq,p-99pt5-eq) 329277
(so2-50-eq,so2-90-eq,so2-95-eq,so2-99-eq,s-99pt5-eq) 352921 /
opc(p) operating cost ($ per unit level ): 8% of capital cost of a $3 bil plant /
(mining-25,mining-30,mining-35) 2.08
*compare with lindquist et al
(ret-25,ret-30,ret-35) 2.7
(buy-h2o-s,buy-h2o-m) .07
buy-h2o-g .14
upgrading 3.18
dispose-c .4
dispose-u .21
dispose-d 1.86
*compare c and u with cleveland cliffs (1978) pp 95,101,108,164
miscell 4.07
(part-50,so2-50) .01
(part-90,so2-90) .03
(part-95,so2-95) .04
(part-99,so2-99) .06
(part-99pt5,so2-99pt5) .07 /
midyear(tf) middle year of period
prra(c,tf) cost of first unit of re-water per period ($ per acre-foot)
prr(c,tf) cost of renewable water ($ per barrel)
nu(m) investment cost ($ per unit per year);
midyear(tf) = 1982 + theta*ord(tf);
prra(crr,t) = rw1(crr)*(1 + rwesc(crr))**(midyear(t)-1982);
prr(crr,t) = prra(crr,t)/7762;
prg = prga/7762;
nu(m) = 1e9*nutot*num(m)/(nud(m)*days);
Display midyear,prra,prr,prg,nu;
$Stitle modeling of pollutant dispersion and air quality
Scalar boxh box height (km) / .4 /
boxw box width (km) / 40 /
boxl box length - wind speed (km per hr) / 14.4 /
ebm conversion of emissions to ambient concentration
Parameter bc(c) background concentration (micrograms per m3): source: colony eis p. iii-266
/ part-red 10
so2-red 1 /
esa(c) 1980 standards for ambient concentration (micrograms per m3): source: ota p 266
* part% annual geometric mean
* so2 % annual arithmetic mean
/ part-red 45
so2-red 80 /;
ebm = (1e6)/(boxh*boxw*boxl*24*330);
* part(kg/yr)*10**9(micro-g/kg)*10**6 (micro-g/m*3)
* --------------------------------------- = part-con -------------
* h(m)*w(m)*l(m)*(hr/day)*(day/yr) (mil bbl/yr)
$Stitle computations
Scalar rfs recoverable fraction of shale (see ota p 127 on multiple mining levels / .6 /
rho discount rate / .15 /
zeta life of productive units (years) / 20 /
Parameter po(c) 1982 prices for final products ($ per unit)
/ syncrude 34.
lpg 30.00
ammonia 135.
coke 75.
sulfur 127. /
ycf(c) annual rate of increase in final product value / (syncrude,lpg) .05 /
bts(c) total shale reserves (million tons)
/ shale-25 1820000.
shale-30 119000.
shale-35 40800. /
bra(c) available renewable water (million acre-feet per year): source: ota p 385
/ sur-water .818
mo-water 1.1 /
bga(c) groundwater available (million acre-feet) / grnd-water 20 /
bd(c) available canyon space (million cubic yards) / can-space 6780 /
indcap(tf) number of new plants allowed each period
/ 1990-94 4.
1995-99 5.
2000-04 6.
2005-09 6. /
pf(c,t) price of final products ($ per unit)
bs(c) recoverable shale (million tons)
br(c) available renewable water (million bbls per year)
bg(c) groundwater available (million bbl)
bbr(c) amount of renewable water between break-points (million bbl per year)
bbg(c) amount of groundwater between break-points (million bbl)
bbrcum(c,i) amount of renewable water at each break-point (million bbl per year)
bbgcum(c,i) amount of groundwater at each break-point (million bbl)
dr(c,i,t) area under supply curve at break-points for renewable water (mill $ per year)
dg(c,i) area under supply curve at break-points for groundwater (million $ per year)
drd(c,i,tf) difference of dr and previous value of dr (million $ per year)
dgd(c,i) difference of dg and previous value of dg (million $ per year)
newcap(t) new capacity allowed each period (million bbl per yr)
ts(tf,tf) time summation matrix
del(tf) discount factor
sigma capital recovery factor;
pf(cf,t) = po(cf)*(1+ycf(cf))**(midyear(t) - 1982);
bs(crs) = bts(crs)*rfs;
br(crr) = 7762*bra(crr);
* 20 mil. acre feet * 7762 bbl/acre foot = 155240 mil barrels
bg(crg) = 7762*bga(crg);
*comment: the price of raw materials is assumed to rise linearly as a function of the amount used. the total cost
* of using a reserve is equal to the area under the supply curve, or price times quantity. the area under the
* the linear supply curve from the origin (q=0) to a point where u units have been used is equal to u times
* p(initial) + 1/2 (u squared) times the slope of the supply curve. since this is quadratic, an approximation
* scheme is used.
* let del = cumulative area under the supply curve. the graph of del vs u is convex so it is approximated
* with linear segments. i represents the set of segments. the points are equidistant with bb being the amount
* between break points and bbcum the cumulative of bb. del is computed at each value of bbcum.
bbr(crr) = br(crr)/card(i);
bbg(crg) = bg(crg)/card(i);
bbrcum(crr,i) = ord(i)*bbr(crr);
bbgcum(crg,i) = ord(i)*bbg(crg);
dr(crr,i,t) = prr(crr,t)*bbrcum(crr,i) + .5*bbrcum(crr,i)**2*(prm(crr) - 1)*prr(crr,t)/br(crr);
dg(crg,i) = prg*bbgcum(crg,i) + .5*bbgcum(crg,i)**2*(prm(crg) - 1)*prg/bg(crg);
drd(crr,i,t) = dr(crr,i,t) - dr(crr,i-1,t);
dgd(crg,i) = dg(crg,i) - dg(crg,i-1);
newcap(t) = 50*.33*indcap(t);
ts(tf,tfp)$(ord(tfp) lt ord(tf)) = 1;
del(tf) = (1+rho)**(1982 - midyear(tf));
sigma = (1+rho)**2*rho / (1-(1+rho)**(-zeta));
Display ts,del,sigma;
$Stitle model definition
Positive variables
z(p,tf) process level (million units per yr)
x(c,tf) output of final products (million units per yr)
us(c,tf) purchases of shale (million tons per yr)
ur(c,t) purchases of renewable water (million bbls per yr)
ug(c) purchases of groundwater (million bbls)
h(m,tf) investment levels (million units per yr)
uur(c,i,tf) renewable water purchases between points (million bbl per yr)
uug(c,i) groundwater purchases between points (million bbl)
Variables
pi discounted profit (million $)
r(tf) revenue from sales (million $ per yr)
phiy(tf) shale cost (million $ per yr)
phir(tf) renewable water cost (million $ per yr)
phig groundwater cost (million $)
phik(tf) cost of capital (million $ per yr)
phio (tf) operating cost other than rawmat (million $ per yr)
Equations
msu(c,tf) material balance on shale usage (million tons per yr)
mrw(c,tf) material balance on renewable water purchases (million bbl per yr)
mgw(c) material balance on groundwater usage (million bbl)
mi(c,tf) material balance on intermediate products (million units per yr)
mf(c,tf) material balance on final products (million units per yr)
mnmr no mine refilling in first two periods (million units)
mmr3 mine refilling in third period (million units)
mmr4 mine refilling in fourth period (million units)
cdc(c) aboveground spoils disposal in canyons (million cubic yds)
cs(c) limits on total shale purchases (million tons)
mrwb(c,tf) renewable water purchases over all breaks (million bbl per yr)
mgwb(c) groundwater purchases over all breaks (million bbl)
cae(c,tf) limits on air pollution (micrograms per m3)
cpu(m,tf) capacity constraints (million units per yr)
cind(tf) limit on new syncrude capacity by period (million bbls per yr)
arev(tf) revenue accounting (million $)
aroy(tf) royalty accounting (million $)
arw(tf) renewable water accounting (million $)
agw groundwater accounting (million $)
acap(tf) capital costs (million $)
aopc(tf) operating cost accounting (million $)
aprof profit accounting (million $);
$Eject
msu(crs,t).. sum(p, a(crs,p)*z(p,t)) =e= -us(crs,t);
mrw(crr,t).. sum(p, a(crr,p)*z(p,t)) =e= -ur(crr,t);
mgw(crg).. sum((p,t), a(crg,p)*z(p,t)) =e= -ug(crg);
mi(ci,t).. sum(p, a(ci,p)*z(p,t)) =e= 0;
mf(cf,t).. sum(p, a(cf,p)*z(p,t)) =e= x(cf,t);
mnmr.. sum((pdu,t1), z(pdu,t1)) =e= 0;
mmr3("2000-04").. sum(pdu, z(pdu,"2000-04")) =l= .413*sum(pmu, z(pmu,"1990-94"));
mmr4("2005-09").. sum(pdu, z(pdu,"2005-09")) =l= .413*sum(pmu, z(pmu,"1990-94") + z(pmu,"1995-99"))
- sum(pdu, z(pdu,"2000-04"));
cdc(cc).. theta*sum((p,t), a(cc,p)*z(p,t)) =l= bd(cc);
cs(crs).. theta*sum(t, us(crs,t)) =l= bs(crs);
mrwb(crr,t).. ur(crr,t) =e= sum(i, uur(crr,i,t));
mgwb(crg).. ug(crg) =e= sum(i, uug(crg,i));
cae(er,t).. ebm*sum(p, a(er,p)*z(p,t)) + bc(er) =l= esa(er);
cpu(m,t).. sum(p, b(m,p)*z(p,t)) =l= sum(tf$ts(t,tf), h(m,tf));
cind(t).. x("syncrude",t) =l= x("syncrude",t-1) + newcap(t);
arev(t).. r(t) =e= sum(cf, pf(cf,t)*x(cf,t));
aroy(t).. phiy(t) =e= ps*sum(p, a("syncrude",p)*z(p,t));
*comment: the approximation to the area under the supply curve equals
* the value on the ordinate of the curve del = f(u). this is the
* amount u in excess of the last break point times the slope of that
* line segment minus the previous del (where the line segment
* commenced).
arw(t).. phir(t) =e= sum(crr, sum(i, drd(crr,i,t)*uur(crr,i,t)) / bbr(crr) );
agw.. phig =e= sum(crg, sum(i, uug(crg,i)*dgd(crg,i)) / bbg(crg) );
acap(t).. phik(t) =e= sigma*sum((m,tf)$ts(t,tf), nu(m)*h(m,tf));
aopc(t).. phio(t) =e= sum(p, opc(p)*z(p,t));
aprof.. pi =e= theta*sum(t, del(t)*(r(t) - phir(t) - phio(t) - phiy(t) - phik(t))) - phig;
Model synfuels /all/;
uur.up(crr,i,t) = bbr(crr);
uug.up(crg,i) = bbg(crg);
Solve synfuels maximizing pi using lp;
$Single
$Stitle report section
Parameter
pilev discounted cash flows (billion 1982 $)
xlev(c,tf) production of final products (million units per stream day)
noplants(tf) number of 50000 bpd plants on line
zlev(p,tf) process level (million units per stream day)
rwd(c,tf) renew water purchased this period (acre-feet per day)
rwy(c,tf) renew water purchased this period (1000 acre-feet per year)
rwclast(c,tf) cost of last acre foot of renewable water used ($)
gwd(c,tf) groundwater purchased this period (acre-feet per day)
gwy(c,tf) groundwater purchased this period (1000 acre-feet per year)
gwp(c,tf) groundwater purchased this period (1000 acre-feet per period)
gwcy(c,tf) cost of groundwter used each period (million $)
gwclast(c) cost of last acre foot of ground water purchased ($)
capcp(tf) capital investment per period (billion dollars)
capcpl(tf) capital investment per plant (billion dollars)
capcm(tf,m) capital cost per productive unit (million $ per 50000 bbls)
capcmt(tf) capital cost per standard size plant (million $)
revy(tf) revenue per year (billion $)
tcosty(tf) expenditures per year (billion $)
cashfly(tf) net cash flows per year (billion $)
revb(tf) revenue per barrel of syncrude ($)
tcostb(tf) cost per barrel of syncrude excluding groundwater ($)
roycb(tf) royalty cost per barrel of syncrude ($)
swcb(m,tf) surface water cost per barrel of syncrude ($)
mwcb(m,tf) missouri river cost per barrel of syncrude ($)
gwcb(m,tf) groundwater cost per barrel of syncrude ($)
capcb(tf) capital cost per barrel of syncrude ($)
oprcb(tf) operating cost per barrel of syncrude ($)
pccb(tf) pollution control cost per barrel of syncrude ($)
elev(c,tf) concentration of pollutants (micro-gram per m3)
pccpp(m,tf) particulate control cost by equipment and period ($)
pccsp(m,tf) so2 control cost by equipment and period ($)
capmp(tf) capital cost of particulate control (million $ per plant)
capms(tf) capital cost of so2 control (million $ per plant)
fracsy(c,tf) percent of available shale mined per year
fracst(c) total percent of available shale mined in all periods
fracrwy(c,tf) percent of available renewable water purchased
fracgw(c,tf) percent of available groundwater purchased
dacper(tf) percent of disposal activity in canyons
dauper(tf) percent of disposal activity underground
dadper (tf) percent of disposal activity distant;
pilev = pi.l/1000;
xlev(cf,t) = x.l(cf,t)/330;
noplants(t) = 20*xlev("syncrude",t);
zlev(p,t) = z.l(p,t)/330;
rwd(crr,t) = ur.l(crr,t)/(3.30*.7762);
rwy(crr,t) = .33*rwd(crr,t);
rwclast(crr,t)$ur.l(crr,t) = 7762*(prr(crr,t) + ur.l(crr,t)*(prm(crr)-1)*prr(crr,t)/br(crr));
gwd(crg,t) = -sum(p, a(crg,p)*z.l(p,t))/(3.3*.7762);
gwy(crg,t) = .33*gwd(crg,t);
gwp(crg,t) = theta*gwy(crg,t);
gwcy(crg,t) = (gwp(crg,t)*prg + .5*gwp(crg,t)**2*(prm(crg)*prg - prg)/bg(crg)
- sum(tp$ts(t,tp), gwp(crg,tp)*prg + .5*gwp(crg,tp)**2*(prm(crg)*prg - prg)/bg(crg)))/theta;
gwclast(crg)$ug.l(crg) = prga + prga*ug.l(crg)*(prm(crg)-1)/bg(crg);
capcp(tf) = .001*sum(m, nu(m)*h.l(m,tf));
capcpl(tf) = capcp(tf)/(noplants(tf+1) - noplants(tf));
capcm(tf,m) = nu(m)*h.l(m,tf)/(noplants(tf+1) - noplants(tf));
capcmt(tf) = sum(m, capcm(tf,m));
revy(t) = r.l(t)/1000;
tcosty(t) = (phik.l(t) + phiy.l(t) + phir.l(t) + phio.l(t))/1000;
cashfly(tf) = revy(tf) - tcosty(tf);
revb(t) = r.l(t)/x.l("syncrude",t);
tcostb(t) = (phiy.l(t) + phir.l(t) + phik.l(t) + phio.l(t))/x.l("syncrude",t);
roycb(t) = phiy.l(t)/x.l("syncrude",t);
swcb(mrs,t) = (sigma*sum(tfp$ts(t,tfp), nu(mrs)*h.l(mrs,tfp)) + sum(prws, opc(prws)*z.l(prws,t))
+ sum(crrs, sum(i, drd(crrs,i,t)*uur.l(crrs,i,t))/bbr(crrs))) / x.l("syncrude",t);
mwcb(mrm,t) = (sigma*sum(tfp$ts(t,tfp), nu(mrm)*h.l(mrm,tfp)) + sum(prwm, opc(prwm)*z.l(prwm,t))
+ sum(crrm, sum(i, drd(crrm,i,t)*uur.l(crrm,i,t))/bbr(crrm))) / x.l("syncrude",t);
gwcb(mrg,t) = (del(t)*sum(tfp$ts(t,tfp), nu(mrg)*h.l(mrg,tfp)) + sum(pgw, opc(pgw)*z.l(pgw,t))
+ sum(crg,gwcy(crg,t))) / x.l("syncrude",t);
capcb(t) = phik.l(t)/x.l("syncrude",t);
oprcb(t) = phio.l(t)/x.l("syncrude",t);
pccb(t) = (sigma*sum(tfp$ts(t,tfp), sum(mp, nu(mp)*h.l(mp,tfp)) + sum(ms, nu(ms)*h.l(ms,tfp)))
+ sum(pp, opc(pp)*z.l(pp,t)) ) / x.l("syncrude",t);
elev(er,t) = ebm*sum(p, a(er,p)*z.l(p,t)) + bc(er);
pccpp(mp,tf) = nu(mp)*h.l(mp,tf);
pccsp(ms,tf) = nu(ms)*h.l(ms,tf);
capmp(tf) = sum(mp, nu(mp)*h.l(mp,tf)) / (noplants(tf+1) - noplants(tf));
capms(tf) = sum(ms, nu(ms)*h.l(ms,tf)) / (noplants(tf+1) - noplants(tf));
fracsy(crs,t) = 100*us.l(crs,t)/bs(crs);
fracst(crs) = theta*sum(t, fracsy(crs,t));
fracrwy(crr,t) = 100*rwy(crr,t)/(bra(crr)*1000);
dacper(t) = 100*z.l("dispose-c",t)/sum(pd, z.l(pd,t));
dauper(t) = 100*z.l("dispose-u",t)/sum(pd, z.l(pd,t));
dadper(t) = 100*z.l("dispose-d",t)/sum(pd, z.l(pd,t));
fracgw(crg,t) = 100*gwy(crg,t)/(bga(crg)*1000);
Display po, ycf, rw1, prra, prga, pf, rho, pilev, indcap, noplants, x.l, x.m, xlev, revy, tcosty, cashfly
revb, tcostb, roycb, swcb, mwcb, gwcb, capcb, oprcb, pccb, pccpp, pccsp, rwclast, gwclast, z.l
zlev, h.l, capcp, capcm, capcpl, capmp, capms, rwy, rwd, fracrwy, gwy, gwd, fracgw, fracsy, fracst, elev
phiy.l, r.l, phir.l, phik.l, gwp, gwcy, ur.l, ug.l, cae.m, cind.m, dacper, dauper, dadper;